Madison Street Reconstruction
This project will reconstruct the deteriorated section in front of Terrace Park Pool. In addition, a new outfall structure and storm drainage pipe will be installed between Covell Lake and Veterans Memorial pond. The street will be totally closed off to traffic and the project has started.