26th Street Overlay- Cleveland Avenue to Alpine Avenue

Project Update 9/1/2023

  • Construction of the ADA Ramps is almost complete on the south side of 26th Street.
  • Asphalt paving of the south side will begin at the end of August.
  • Work will move to the north side of the street in early September

Commuter Route Information:  

  • 26th Street is reduced to one lane of traffic in each direction between Cleveland Avenue and Alpine Avenue
  • Pedestrians should utilize the sidewalk on the north side of 26th Street while work is taking place on the south side of 26th Street, and they should utilize the sidewalk on the south side of 26th Street while work is taking place on the north side of 26th Street
     

Project Milestones

Phase 1A
Traffic will be reduced to the southern two lanes between Cleveland Avenue and Bahnson Avenue, with one lane in each direction.

  1. Complete storm sewer repairs.
  2. Complete ADA ramp improvements.
  3. Cold mill concrete pavement.
  4. Asphalt patching.
  5. Asphalt overlay.

Phase 1B
Traffic will be reduced to the southern two lanes between Bahnson Avenue & Alpine Avenue, with one lane in each direction.

  1. Complete ADA ramp improvements.
  2. Cold mill concrete pavement.
  3. Asphalt patching.
  4. Asphalt overlay.

Phase 2A
Traffic will be reduced to the northern two lanes between Cleveland Avenue & Bahnson Avenue, with one lane in each direction.

  1. Complete ADA ramp improvements.
  2. Cold mill concrete pavement.
  3. Asphalt patching.
  4. Asphalt overlay.

Phase 2B
Traffic will be reduced to the northern two lanes between Bahnson Avenue & Alpine Avenue, with one lane in each direction.

  1. Complete ADA ramp improvements.
  2. Cold mill concrete pavement.
  3. Asphalt patching.
  4. Asphalt overlay.

Pouring concrete for an accessible curb ramp

Prep work for an accessible curb ramp

View of a completed accessible curb ramp

A machine patching concrete joints

Project Overview

Completion Date:

Fall 2023

Contract Amount: 

$2,398,392 

Project Summary:

This project will consist of an asphalt overlay on 26th Street from Cleveland Avenue to Alpine Avenue. Improvements will include accessible curb ramp replacement, minor storm drainage improvements, concrete joint cleaning and preparation, concrete milling, and an asphalt overlay.

Contact Information

City of Sioux Falls
Tallon Cazer
(605)-367-8609
tcazer@siouxfalls.org

Consultant Name:

Ulteig
Enock Ariko
Enock.ariko@ulteig.com
(605)323-6054

Contractor Name:

Black-Top Paving