Benson Road and I-229 Watermain Crossing
Project Update 3/28/2022
- No updates will be provided during construction.
Commuter Route Information:
- There will be periodic lane closures on Benson Road, I-229, and the interstate ramps to allow for equipment loading/unloading.
- These lane closures will be limited in duration.
- At least one lane of traffic in all directions will be maintained at all times.
Project Overview
Completion Date:
November 2022
Contract Amount:
$794,000
Project Summary:
This project consists of installation of a new watermain connection across the Benson Road interchange at I-229 so the watermain is out of the way of the upcoming interchange reconstruction project in 2023. Work will include installation of a new water main, boring of steel casing pipes for installation of the watermain, connecting to existing watermain, and restoration of the site topsoil and seeding.
Contact Information
City of Sioux Falls
Tallon Cazer
tcazer@siouxfalls.org
(605) 367-8609
Consultant Name:
HDR
Lance McQueen
Lance.McQueen@hdr.inc
(605) 610-7955
Contractor Name:
First Rate Excavate, Inc.