Holt Avenue, 28th Street to 33rd Street

Holt Avenue Exhibit

Project Update 6/10/2021 

  • The contractor will be working on grading, curb & gutter repairs and curb ramp upgrades phase three in the coming weeks. 

Commuter Route Information:

  • Holt Avenue is temporarily opened from 28/Bragstad to Klondike.
  • Bragstad and Klondike are temporarily open to through traffic.

Project Milestones

Phase 1

  1. Removals
  2. Watermain Installation
  3. Sanitary Sewer Repairs
  4. Concrete Repairs
  5. New Accessible Curb Ramps
  6. Street Light Improvements
  7. Asphalt Paving (Bottom Lift)
     

Phase 2

  1. Removals
  2. Watermain Installation
  3. Sanitary Sewer Repairs
  4. Concrete Repairs
  5. New Accessible Curb Ramps
  6. Street Light Improvements
  7. Asphalt Paving (Bottom Lift)

Phase 3

  1. Removals
  2. Watermain Installation
  3. Sanitary Sewer Repairs
  4. Concrete Repairs
  5. New Accessible Curb Ramps
  6. Street Light Improvements
  7. Asphalt Paving (Bottom Lift)

Phase 4

  1. Mill Existing Asphalt on Non-Watermain Side of the Street
  2. Top Lift of Asphalt on Entire Project
  3. Site Restoration and Seeding 
   

Project Overview

Completion Date:

July 16, 2021

Contract Amount: 

$782,025.21

Project Summary:

This project will replace the water main along Holt Avenue due to its deteriorating condition.  Work will also include sanitary sewer repairs, street light improvements, concrete repairs, new accessible curb ramps, and an asphalt mill and overlay.

Contact Information

City of Sioux Falls
Shane Balk
sbalk@siouxfalls.org

Consultant Name:

Marshall Engineering, Inc.
Marshall Runge, Project Engineer, 
605-940-0343   
MARSHALL.MARSHALLENG@MIDCONETWORK.COM

Contractor Name:

Lidel Construction Inc.