Pebble Creek Road from Holbrook Avenue to Baneberry Drive and Drexel Drive from 57th Street to Pebble Creek Road

Pebble Creek Map

Project Update 5/5/2020

  • This project is tentatively set to begin in mid-to-late June.

Project Milestones

Phase 1:

  1. Traffic Control and Erosion Control Installation
  2. Removal of Street Surfacing
  3. Installation of Water Main
  4. Installation of Storm Drainage Pipe
  5. Aggregate Base Course Placement
  6. Curb Ramp & Sidewalk Construction
  7. Asphalt Surfacing

Phase 2:

  1. Traffic Control and Erosion Control Installation<
  2. Removal of Street Surfacing
  3. Installation of Water Main
  4. Aggregate Base Course Placement
  5. Curb Ramp & Sidewalk Construction
  6. Asphalt Surfacing

Phase 3:

  1. Traffic Control and Erosion Control Installation
  2. Removal of Street Surfacing
  3. Installation of Water Main
  4. Aggregate Base Course Placement
  5. Curb Ramp & Sidewalk Construction
  6. Final Asphalt Surfacing
  7. Topsoil and Seeding

Commuter Route Information:

Phase 1: Drexel Drive –57th Street to Pebble Creek Road

  • Drexel Drive will be closed to traffic during this phase.

Phase 2: Pebble Creek Road – Drexel Drive to Baneberry Drive

  • Pebble Creek Road will be closed to traffic between Drexel Drive and Baneberry Drive during this phase.

Phase 3: Pebble Creek Road – Holbrook Avenue to Drexel Drive

  • Pebble Creek Road will be closed to traffic between Holbrook Avenue and Drexel Drive during this phase. 

 

Project Overview

Project Summary

This project consists of partial reconstruction of Pebble Creek Road from Holbrook Avenue to Baneberry Avenue, and partial reconstruction of Drexel Drive from 57th Street to Pebble Creek Road. Work will include replacement of the water main, a spot repair to the sanitary sewer main, a sanitary sewer manhole replacement, spot repairs to the curb and gutter, asphalt paving, asphalt mill and overlay of the non-water main side of the street, and upgrades to the accessible curb ramps.

Completion Date:

October 30, 2020

Contract Amount: 

$771,475.64

Contact Information

City of Sioux Falls
Tim Krueger
tkrueger@siouxfalls.org
605-940-5280

Consultant Name:

Short Elliot Hendrickson, Inc. (SEH)
Al Murra
amurra@sehinc.com
605-330-7015

Mike Czech
mczech@sehinc.com
507-215-3715

Contractor Name:

ASCO