Water Main Utility Reimbursements

Instructions on how to properly file for Waterline Utility Oversize

Reimbursement:

  1. Complete attached cover letter with the required information
  2. Complete attached spreadsheet with the oversize utility as-built information
    • a. Use the oversize materials costs from the attached spreadsheet for the proper waterline material. This spreadsheet will be updated every year. ( The reimbursement rate is determined by the year of installation and not the year of submittal. ) If submitting a request for past years, please contact City Engineering to get the oversize costs for that year.

  3. Include a copy of the construction plans showing the as-built information highlighted for the oversize utility.
  4. Submit a signed and dated cover letter, completed spreadsheet with costs figured, and construction plan as-built information to City Engineering.
  5. As-built information will be double checked with the subdivision inspectors and recalculated if necessary.
  6. Engineer/Developer will be contacted to ok final numbers before any reimbursement checks are processed.